Fredsville Evangelical Lutheran Church
Project included...
- Solar Panels
Was a blessing or other dedication ritual done?
Yes
Blessing or ritual file
Congregation has a "Green Team" of some sort:
No
Fredsville Lutheran installed a 28.8 kW Solar Energy System that was activated on April 8, 2024. This grid tie system includes 60 - 480 watt solar panels and two inverters. The system performance is publicly available at www.fredsvillelutheran.org.
For more information about this project, contact:
Lee Gable
Email hidden; Javascript is required.
